A chimney crew does not sell cleanings, it sells hours — and every job eats the cleaning time plus the drive to the next address. Book too few and the truck sits idle; book too many and the last customer gets a call at 6 p.m. This recipe turns the workday length, average cleaning time and average drive time into a whole number of jobs per day, plus the minutes left over.
An 8-hour day at 60 minutes per cleaning and 25 minutes of driving fits 5 jobs with 55 minutes to spare.
The example
Three crews with different job lengths and routes. Longer cleanings and longer drives both shrink the number of jobs that fit.
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Case | Hours | Clean min | Drive min | Jobs | Idle min |
| 2 | Crew A | 8 | 60 | 25 | 5 | 55 |
| 3 | Crew B | 8 | 90 | 30 | 4 | 0 |
| 4 | Crew C | 10 | 45 | 20 | 9 | 15 |
The formula
Total minutes in the day divided by the minutes one job really consumes, rounded down because half a job is not a booking:
How it works
Here is the logic, one piece at a time:
B2*60converts the workday from hours to minutes so it matches the job times.C2+D2is the true cost of one job: the cleaning itself plus the drive to reach it.INT(...)rounds down to whole jobs. A crew cannot finish 5.6 cleanings, so 5.6 is 5.- The second formula multiplies jobs by the per-job minutes and subtracts from the day, exposing the idle time you could sell as a short add-on such as a cap inspection.
Use your real averages from the last month of invoices, not the best day on the calendar.
Try it: interactive demo
Enter the workday length and the minutes per cleaning and per drive.
Variations
Reserve a lunch and truck-load buffer
Subtract fixed daily minutes (lunch, loading, paperwork) before dividing.
Find the jobs a longer day would add
Test a 10-hour peak-season day by changing the hours cell and comparing.
Pitfalls & errors
Drive time is the number most crews guess. Pull it from your GPS or route app; a 25-minute guess that is really 40 minutes costs you a job a day.
Do not use ROUND here. Rounding 5.6 up to 6 books a sixth job you cannot finish.
Heavier jobs (a stainless liner install, heavy creosote) take longer. Keep a separate average per job type.
Practice workbook
Frequently asked questions
Should the last job of the day include a drive?
How do I count a two-person crew?
Stop fighting formulas. Learn them in a day.
This recipe is one of hundreds of real-world formulas we teach. Our Excel Formulas & Functions class covers lookups, logic, text, and dynamic arrays hands-on — live in Dallas–Fort Worth, Houston, Austin, Oklahoma City, Denver, or online.
See the Formulas & Functions Class